Commercial Tower - Riyadh
Smart Building Management System (BMS) for a 20-story commercial tower with central control of all systems.
Major Investment Company
Al Olaya District, Riyadh
2024-06-20
6 months
Gallery
Objective
Improve building efficiency, save energy, and simplify management of all systems through a single central control interface.
Challenge
Managing 20 floors with over 100 offices, with the need to monitor and analyze energy consumption in real-time.
Solution
Installed advanced BMS system with smart sensors on all floors, central control panels, and detailed analytical reports.
Outcomes
40% reduction in energy costs
50% improvement in maintenance response
Comprehensive real-time monitoring
Detailed analytics for decision-making
Improved tenant experience
Services Used
Have a Similar Project?
Contact us today to discuss your needs and how we can help you.